Projects
Current Projects
Client: Murrumbidgee Shire Council
Various Patches on main highway, adding 1% quicklime and recycling asphalt into 250mm depth, double mixing to ensure uniform moisture for compaction and even lime content.
Past Projects

Proten Farm
Client: Hay Shire Council
Adding GP Cement to sinking/failing residential shoulder and recycling asphalt into 150mm depth, double mixing to ensure uniform moisture for compaction and even cement content
Client: Central Vic Stabilising
5600m2, Stabilised with 3% Quicklime (8.5kg/m2) double mixed to 150mm depth to ensure uniform moisture & lime content.
Client: Armstrongs Plant Hire
1835m2 - 60/40 Slag Lime spread at 12kg/m2 (3%) Double Mixed to 250mm Depth to ensure uniform moisture & lime content.
Client: Carrathool Shire Council
7000m x 9m – 63,000m2 subgrade improved using 9kg/m2 of Quicklime, completed in 3 weeks.